Agile Project Management vs. Critical Path Method

The Critical Path Method (CPM) of project management is very commonly used in the management of construction projects.

D. Brown Management Profile Picture
Share

CPM works very well when the components of the design and the project are mostly known to all responsible parties. CPM focuses on either a single value-delivery event such as the completion of a building or in major phases such as turning over a floor at a time.  

Management Tools: Agile Project Management vs Critical Path Method (CPM).

CPM does not work as well in situations where there are significant “Known-Unknowns” about the plan CPM really breaks down when there are “Unknown-Unknowns”:

  • The final destination isn’t crystal clear; even to the leader
  • The path to get there has unknowns
  • The tools and tactics required to get there aren’t known to the team

In these situations more agile management methods are required either in conjunction with or to replace CPM:

There are similarities between all methods.  Develop the systems that work best for your company at this point in time.




Precon Value in Project Delivery Methods
By leveraging preconstruction services, contractors can gain a significant competitive advantage. This chart ranks the impact of precon across the basic project delivery methods and four basic dimensions:
ABC Communication for Clarity
The only valid measure of clear communication is whether the other person(s) understood it as it was meant to be understood. Clarity of communication is not about perfect grammar, format, or frequency though all those play a factor in understanding.
Noel Tichy and the 3 Zones of Learning
When it comes to developing talent in yourself and in others, it is important to know the boundaries of the learning zone as defined by Noel Tichy in his 3 Zones of Learning model.