Agile Project Management vs. Critical Path Method

The Critical Path Method (CPM) of project management is very commonly used in the management of construction projects.

D. Brown Management Profile Picture
Share

CPM works very well when the components of the design and the project are mostly known to all responsible parties. CPM focuses on either a single value-delivery event such as the completion of a building or in major phases such as turning over a floor at a time.  

Management Tools: Agile Project Management vs Critical Path Method (CPM).

CPM does not work as well in situations where there are significant “Known-Unknowns” about the plan CPM really breaks down when there are “Unknown-Unknowns”:

  • The final destination isn’t crystal clear; even to the leader
  • The path to get there has unknowns
  • The tools and tactics required to get there aren’t known to the team

In these situations more agile management methods are required either in conjunction with or to replace CPM:

There are similarities between all methods.  Develop the systems that work best for your company at this point in time.




3 Facts About Ownership Transition Deal Structures
The Deal Structure including dollars, timing, terms, legal entities, taxes, and contractual documents is the most tangible part of the transaction. The Deal Structure WILL NOT do three very critical things - Cash, Capabilities, and Trust.
The Best Contracting Methods for Preconstruction Services
Moving seamlessly from preconstruction to construction requires solid contractual documents modified to fit your particular project and structure.
Advanced Preconstruction Services for Profitable Growth
Preconstruction IS NOT estimating re-branded. Leverage 360 degrees of perspective to improve your preconstruction services with our 7-phase program tailored specifically for your business and market.