Agile Project Management vs. Critical Path Method

The Critical Path Method (CPM) of project management is very commonly used in the management of construction projects.

D. Brown Management Profile Picture
Share

CPM works very well when the components of the design and the project are mostly known to all responsible parties. CPM focuses on either a single value-delivery event such as the completion of a building or in major phases such as turning over a floor at a time.  

Management Tools: Agile Project Management vs Critical Path Method (CPM).

CPM does not work as well in situations where there are significant “Known-Unknowns” about the plan CPM really breaks down when there are “Unknown-Unknowns”:

  • The final destination isn’t crystal clear; even to the leader
  • The path to get there has unknowns
  • The tools and tactics required to get there aren’t known to the team

In these situations more agile management methods are required either in conjunction with or to replace CPM:

There are similarities between all methods.  Develop the systems that work best for your company at this point in time.




Plan Ahead, Adjust Early, and Accelerate Recovery
Construction in any given industry sector or geographical area is a cyclical business. There are four major levers a contractor can pull to ensure the business performs well throughout all economic cycles.
004 - Job Role Transitions in Construction (Intro)
Master role transitions to set yourself and your company apart. From craft to Foreman or ownership succession, transitions challenge careers and profits. Poor planning impacts projects. 3 hours of examples + 25 resources to grow your career.
Talent Alignment & Integration: Four Basic Layers
Talent must be aligned around four basic layers for contractors to achieve results. Integration of talent from the customer through to compensation creates optimum results for all parties over the long-term.