Agile Project Management vs. Critical Path Method

The Critical Path Method (CPM) of project management is very commonly used in the management of construction projects.

D. Brown Management Profile Picture
Share

CPM works very well when the components of the design and the project are mostly known to all responsible parties. CPM focuses on either a single value-delivery event such as the completion of a building or in major phases such as turning over a floor at a time.  

Management Tools: Agile Project Management vs Critical Path Method (CPM).

CPM does not work as well in situations where there are significant “Known-Unknowns” about the plan CPM really breaks down when there are “Unknown-Unknowns”:

  • The final destination isn’t crystal clear; even to the leader
  • The path to get there has unknowns
  • The tools and tactics required to get there aren’t known to the team

In these situations more agile management methods are required either in conjunction with or to replace CPM:

There are similarities between all methods.  Develop the systems that work best for your company at this point in time.




Managing All Deliverables - Beyond the Basic Submittal Log
Maximize your people, projects, profitability, and customer relationships by making your submittal log and process a little less "efficient" and a whole lot more effective.
Growth and Opportunity
Contractors that are growing profitably, have great reputations with their customers, and have a good culture are able to attract and retain the best talent even with the talent shortages the construction industry will face in the next 10+ years.
Four Levels of Integration and Optimization
Operational excellence must be a major component of every contractor’s strategy and baked into their daily behaviors. Optimizing at each of the four major layers requires different levels of thinking, technology, and time span.