Best Methods for Presenting Changes During the Design-Development Phase

Always be conservative, forthright and provide a clear roadmap to successful project delivery.

Raymond Braswell Profile Picture
Share
Contributors David Brown Profile PictureDavid Brown

The biggest thing you want to avoid are changes during construction or delays. Both will impact the income projections and possibly project viability.

  • Be conservative in your conceptual estimate models.
  • Track all changes clearly on a log including value-engineering.
  • Work closely with the Architect so they know the impact of design changes; both good and bad
  • Focus on creative solutions that will provide a clear path to success including quality, cost and schedule.  The project owner and architect may not like some of the proposed solutions but let them be the ones to decide whether to take the path or not.  
  • Be forthright and proactive in your communication. 
  • Leverage the communication capabilities of Senior Leadership who can translate the technical details from the Conceptual Estimator and Project Manager for the Project Owner and Architect.  
  • Meet weekly at a minimum.  
CM at Risk: Value Engineering Changes. Invoice for Sporting Goods Store Project representing $399.283 over budget.

 

Learn more about building Advanced Preconstruction Services and Business Development capabilities along with other General Contractor Solutions for profitable growth in all economic conditions.   


Best Methods for Presenting Changes During the Design-Development Phase
Dominate your competition by contracting for preconstruction services while projects are still concepts on scratch paper. This series of videos will look at the preconstruction process from the perspective of the Project Owner, Architect, and Contractor. ...

Best Methods for Presenting Changes During the Design-Development Phase
Dominate your competition by contracting for preconstruction services while projects are still concepts on scratch paper. This series of videos will look at the preconstruction process from the perspective of the Project Owner, Architect, and Contractor. ...

Headcount, Stages of Contractor Growth, and Growth Inflection Points
Every contractor will navigate very predictable stages of growth. Each of these represents about a tripling of headcount and requires different leadership focus, strategies, structures, and systems. Stress and failure points are also very predictable.
8 Factors in Winning at the RFP Stage for CMAR Projects
After developing the opportunity, the Request for Proposal (RFP) is the first gate you have to get through to win a CM @ Risk project. Scoring is different from each project owner but there are eight major factors.
Bill Walsh - Planning the First 25 Plays
Construction success depends on both the ability to rigorously plan as well as the ability to quickly react to changing field conditions. This is similar to sports and a lot can be learned from the disciplines of great coaches.