Lean Principle - Value Stream

A contractor’s value stream is every step required to take raw materials and information then deliver a completed project to the waiting hands of a customer.

D. Brown Management Profile Picture
Share

A deep understanding of this value stream at various levels of detail down to actual installation steps is the foundation upon which major productivity improvements can be made.  

Field Productivity: Lean Principle - Value Stream.

As an example consider every step required to put lighting in a conference room - these are just the highlights:  

  • Initial design requirements
  • Quotes from distributor for estimating
  • Submittals and approvals
  • Ordering, tracking and receiving
  • Moving around jobsite to work area
  • Installation
  • Inspection
  • Training of the customer
  • Punch list

This is the highest level and if you mapped out each of those in another 5-25 steps you would start to see a clear picture of what it really takes to install a light fixture in a conference room.  

Start at the highest level - what can be cut out, reduced or sequenced differently?  

Look at the details - can you use 2 screws instead of 4?  50% cost savings at that step! 

Remember that the customer just wants light - could a skylight or more windows reduce the lighting need at the design stage?  


Labor Productivity Workshop


Lean Principle - Value Stream
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Lean Principle - Value Stream
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Muhammad Ali - Pebble in the Shoe
Construction contracting is largely a game of operational excellence. Between the massive changes going on in the industry and daily operations it is easy for leaders and their teams to overlook the small opportunities for improvement every day.
Lean Principle - 3 Enemies of Lean
Profitable growth comes from operating within a target capacity and capability range - and continually increasing those ranges. Operating with consistent overload, consistent under capacity, or with consistently high variability is not sustainable.
The Average Field Day in Detail (Craft Labor + Foreman)
Labor is often the biggest cost variable on a construction project. Just over half the field hours are related to actual installation. Understanding how time is spent on average in the field is the first step to improving field productivity.