Project Delivery - CM at Risk

The Construction Management at Risk (CMAR) delivery model combines Design-Build and Design-Bid-Build.

D. Brown Management Profile Picture
Share

The best elements of Design-Build and Design-Bid-Build are combined while eliminating many of the negatives.

CM at Risk: Project Delivery Methods - Definition of CM at Risk and pros and cons.

The CM role is critical for all project delivery methods acting on behalf of the Project Owner and controlling the project’s timeline, cost, and quality within a defined scope. This is known as the Project Management Triangle.  

CMAR integrates the role of the Construction Manager (CM) and the Contractor (GC) while the Project Owner still contracts separately with the Architect.  

The CM+GC combination leverages their depth of constructability knowledge and resources, working hands-on with the Architect and Project Owner from the very initial Programming and Schematic phases.  

The contracts typically have a fixed fee, open-book on costs, a Guaranteed Maximum Price (GMP), and a cost-savings sharing incentive.

This allows the Project Owner to retain both direct control over the design as well as flexibility for rapidly evolving project scopes. The tighter integration of design and construction leads to faster delivery.  

CMAR is one of the most frequently used methods for the ENR Top 400.  

Key downsides include the difficulty in selecting a CM with the best qualifications and the Architect not accepting input from the CM.  

In some situations, the integration of the roles can be challenging when it comes to decisions that require balancing the needs of the Project Owner with the needs of the Contractor, which is why selection is so crucial for success.


Project Delivery - CM at Risk
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Project Delivery - CM at Risk
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

The Productivity-Talent Bonus
Contractors will receive a major talent bonus when they put a relentless focus on field productivity. They will become “Talent Magnets” for the best in the industry making them unstoppable even in the face of major talent shortages.
Leading vs Lagging
Clearly defining the outcome you want in clearly measurable terms is critically important so that you and everyone else knows exactly what winning looks like. As challenging as defining clear measurable outcomes is; that is the easiest part.
Cash Flow Tip 3 - Contractual Details Matter
The reason we are called contractors is because we work off of a contract that defines the scope and terms of what we build. How we negotiate and manage the contract determines cash flow.