Project Delivery - Integrated Project Delivery

Integrated Project Delivery (IPD) can be the best method for a project if the culture and competencies of all parties, including the Project Owner, are all aligned.

D. Brown Management Profile Picture
Share

In this project delivery method, the Architect and CM+GC, along with key consulting engineers and key specialty contractors, are all bound by the same contract with the owner. 

CM at Risk: Project Delivery Methods - Definition of Integrated Project Delivery and pros and cons.

Project Delivery - Integrated Project Delivery
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Project Delivery - Integrated Project Delivery
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Lean Principle - Pulling vs. Pushing and the Four Most Powerful Words for Improving Productivity
“What do you need?” are the four most powerful words for improving productivity, developing a team, and building engagement. "Pull-Planning" can be used way beyond building a project. The principle is the foundation for many aspects of life and business.
Lean Principle - Stop Work (Until Problems Are Corrected)
All construction projects will run into some degree of problems. It is how the project team chooses to manage these problems that ultimately determines the outcome of the project.
Lean Principle - 5S Habits for Building a Productive Work Environment
5S is a foundational concept for creating a productive work environment and continuous improvement. The 5S process is to productivity what eating a healthy breakfast and exercising is to your health - daily consistency will change your life.