What is Lean

Labor productivity in the construction industry impacts all contractors and project owners.

D. Brown Management Profile Picture
Share

This has become even more challenging with the craft labor shortage. Training field supervisors and the entire project team the tools, workflows and behaviors that will improve production is a big part of the solution.

What is Lean? Maximize customer value while minimizing waste.

The Training Within Industry program used during WWII can be viewed as the most massive vocational supervisory training and process improvement program ever rolled out. Most of the principles are as applicable to solving our field productivity and talent shortage problems today as they were then. Every leader in the construction industry must become a student of these prior lessons learned then figure out how the best ways to apply them to their teams and companies.  
Read more: Training Within Industry: Job Instruction

If you want to learn more about the best resources and talent we have found for helping contractors improve labor productivity contact us.  That is one of our employees grandmother in the picture who was trained very quickly to build airplanes at the Boeing plant in Washington while her grandfather was serving on the USS Lexington.




Lean Principle - 8 Categories of Waste
The first step in improving labor productivity in construction is improving everyone’s ability to see the waste. Waste can then be broken down into 8 major categories. Like colors these are often interrelated.
Continuous Improvement: Plan, Do, Check, and Act (PDCA)
Improving productivity in construction is exceptionally challenging. It must be embraced as a journey and not a destination. It must be made into a game so that people clearly see what winning looks like and fall in love with the process.
Weekly Percent Planned Complete (PPC) and Project Performance
Improving the project planning and delivery process starts with improving predictability around the schedule. Nearly every Superintendent and Foreman is familiar with the Short-Interval-Plan (SIP) and typically fill one out weekly looking ahead 1+ weeks.